I'm remodeling and about to install joist traks under the subfloors (over crawlspace) and install engineered floors above.
Should I install the floors first as nail down and than the joist traks after grinding off the nails that went through?
Or should I glue down the floors instead?
Also, any advice on underlayment to be used?
Thanks,
Tim |