Sprtsguy,
It's OK. My mother started DAMN (National Mothers Against Dislexia)
It is not my name but that of Nikola Tesla--the greatest inventor to have ever lived (He invented radio amoung hundreds of other things which make our lifestyle possible)
When I built the school it also was initially designed with a red iron roof (48" depth)
The engineer would not consider a concrete roof--he maintained it was not possible or feasable and would be too expensive.
I releived him of any further obligations and warned him to not drive across any bridges on his way home.
"It is not the impossible over which I stumble but the improbable"
I hired an engineer who had an imagination and the roof was thinner (32" depth) cheaper and faster.
It can very much depend upon what someone wants to consider as well as what is in your market.
What we did required a much larger crane but we were able to find just what we needed. The 57,000 sq. ft. of roof went together in 1 1/2 days once all things were in place and staged. (1/2 day extra due to a broken hydraulic hose on the crane)
It was like watching a beautiful symphony unfold.