Posted By WI HANK on 08/11/2009 6:03 PM
Thanks jonr, my building permit should be anyday. My plan is to from the perimeter of my SFPF - slabe on grade with a 2 x 12 w/2" foam on the sides and bottom of the footing, that will give me a net depth of a 9 1/4 " footing.
Have you considering using Fast Foot instead of that 2x12 for your footing forms?
Fast Foot link