Hi Benwr,

I went with the foundation design as shown in my previous post. It's sort of a mix between floating slab and a club footing, since there is rebar that ties the foundation to the slab.

The bedrock was sloped, so one side has a foundation ~1' high, while the other is about 3.5' high. Fill was compacted inside. The plumbing is finishing up now, and then the slab will be poured. Let me know if you have questions.


Baldwin2014User is Offline
Basic Member
Basic Member
Send Private Message
Posts:123

--
16 Nov 2009 06:47 PM
lol no questions...


benwrUser is Offline
New Member
New Member
Send Private Message
Posts:4

--
16 Nov 2009 07:35 PM
Did you scribe the icf forms directly to bedrock? or did you scribe a mudsill first and then the forms on top? my site varys in height and has a few depressions in the rock, I was told that icf forms require a mudsill and can not be cut to fit the contours of the rock. Any pictures of the construction would be great.

Thanks


JimmeryUser is Offline
New Member
New Member
Send Private Message
Posts:25

--
16 Nov 2009 11:33 PM
Yup, ICRs were scribed directly to the rock, as shown in my schematic. The bedrock was cored every 32" and rebar was placed with epoxy, linking the rock with the foundation. Everyone that has seen this foundation has commented on how solid (and overbuilt) it is. It's not gonna budge...

Attachment: ICF scribed to bedrock 1.jpg
Attachment: ICF scribed to bedrock 2.JPG
Attachment: ICF scribed to bedrock rebar.jpg

benwrUser is Offline
New Member
New Member
Send Private Message
Posts:4

--
21 Nov 2009 12:06 PM
Thanks for the pics, are you going to use any water proofing where the bedrock and icfs meet? keep us updated onn your progress


JimmeryUser is Offline
New Member
New Member
Send Private Message
Posts:25

--
21 Nov 2009 01:04 PM
Just expanding foam to fill in the cracks. The plumbing rough-in is done, the 2" foam is down, and rebar and PEX tubes for radiant floor heating is in. The slab will be poured in a few days. I was suprised that there was no vapour barrier placed under the foam. My contractor says the foam is a vapour barrier itself, so I don't need anything else.


kernoUser is Offline
New Member
New Member
Send Private Message
Posts:1

--
14 Dec 2009 01:08 PM
The photo's realy help. Keep posting as you progress, I'm starting to build in the spring and trying to learn as fast as I can.


JimmeryUser is Offline
New Member
New Member
Send Private Message
Posts:25

--
14 Dec 2009 04:20 PM
kerno, did you need any information in particular? After the plumbing delaying the project for a very long time, the house is now being framed. I won't be doing much else to the foundation other than parging the ICF exterior, so I don't know what else to post on this thread that would be relevant to ICF foundation design.


ICFconstructionUser is Offline
Veteran Member
Veteran Member
Send Private Message
Posts:1324
Avatar

--
16 Dec 2009 06:21 AM
Looks interesting, too bad you aren't doing the whole thing ICF.


Brad Kvanbek - ICFconstruction.net
You are not authorized to post a reply.
Page 2 of 2 << < 12


Active Forums 4.1
Membership Membership: Latest New User Latest: croccohvacusa New Today New Today: 0 New Yesterday New Yesterday: 0 User Count Overall: 35027
People Online People Online: Visitors Visitors: 164 Members Members: 0 Total Total: 164
Copyright 2011 by BuildCentral, Inc.   Terms Of Use  Privacy Statement