Quad-Lock Banner
 
 Register  Login   
 
Get FREE Quote and Information
Site Sponsors

For Advertising Info,
Call 866-316-5300 or 312-223-1600

User Name: Password:
Learn about green building products and methods Find answers, products, and people Connect with homeowners, professionals, and suppliers Register for free at GreenBuildingTalk
Unanswered Active Topics
Forums Search Members
Forums > Green Building Technologies > Insulating Concrete Forms (ICFs) > Subject: Excavation Advice: Temp Wall System

You are not authorized to post a reply.   
Prev Next
Author Messages
SlojoUser is Offline
Registered Users
New Member
New Member
Send a message
Posts:7


11/21/2007 8:18 PM  
I am in the initial design phase to build a 'root cellar' approximately 8' x 10' that will be completely underground, with and 8' useable ceiling height.  On top of this area will sit a shed although not connected to the structure below.

My question has to do with the actual excavation and safety relating to holding the soil back from the work area.  The planned location of the structure does not allow for typical excavation equipment or S.O.P's to be employed, such as pulling back yards and yards of earth from the build site.

The question is:  What is the most cost effective way to do this excavation with a temporary 'hold-back' wall system?

It should be noted that although 'temporary', the 'hold-back' walls can be left in place and back filled over and around.

I was thinking of sinking 4 or 6 10' or 12' Sonotubes with rebar, filling with concrete, then as I excavate around them filling the space between the Sonotubes with 2x4's or 3/4" ply.

What do you think?

Any and all advice is appreciated.

Thanks
Joe
You are not authorized to post a reply.
Forums > Green Building Technologies > Insulating Concrete Forms (ICFs) > Excavation Advice: Temp Wall System



ActiveForums 3.6
Find a Green Building Professional
Get Listed
Professionals Serving
Your Location:
Copyright 2009 by BuildCentral, Inc.   Terms Of Use  Privacy Statement