I'd use plates, to dissapate heat more effectively. I'd be concerned for heat striping otherwise, and/or higher than necessary water temps. I find it hard to believe he's getting a 4.5" even lateral spread from the pipe with that, but hey, maybe I'm wrong.
But it's a viable method, sure. I'd probably spec a tighter than normal on center to make sure floor temp was even, like 6" o.c. or so. But if his clients can say there isn't heat striping, that's fine.
The question I would have is why not just do a thick mud base and use 3/8" pipe, and skip the plywood altogether, or maybe use strapping at a wider on center and more wet stuff? That would work better, I would think. |