we sell HDPE by the pallet only, You will need some design assistance on loop length. Perhaps the person providing the Geo Unit can assist, One solid long pipe will overburden your pump, better to have several 500 foot runs and a manifold. If you do not have fusion tools or access to you can use 3/4 Pex B as an alternative. Dan |