I have to travel from my hot water source/furnace through 30 feet of a 4 foot crawl space (new construction) to my tubing feed/return panel (which has four loops of 300 feet each). I can either go the shortest easiest route but it would necessitate using four 90 degree bends, or I can travel an additional 10 feet and make a large loop through the joists, and only have two 90 degree elbows in my 3/4 inch white flexible main feed and return lines. All input is appreciated. Question: Is it any worse (will it hamper flow) to use the elbows? Thank you so very very much for your time.
Claude Stein
Cork-Guy
New Member
Posts:22
27 Jan 2011 10:06 PM
I believe elbows will hamper the flow a bit, however I'm not 100% sure.
Learn about eco-friendly <a href="http://www.corkflooringpros.com">cork flooring</a> and keep warm with an environmentally friendly <br> <a href="http://www.ventless-fireplace.org">ventless fireplace</a>.
3cityblue
Basic Member
Posts:111
28 Jan 2011 01:01 PM
Here is how I interpret your different options. Option A - 30 feet and 4 90 deg. bends OR Option B - 40 feet and 2 90 deg. bends. Also assuming that the 90's are PEX tube bends and not fittings. The table I used suggests that a 3/4" 90 deg bend needs to have a minimum bending radius of 7". The circumference of that circle would be (7*2*pi=43.98") so a 90 would be (43.98"/4=10.99"), lets say 11". So, Option A = 30' + (11"*4)=33.66 equivalent feet. Option B = 40 + (11"*2)=41.83 equivalent feet. Seems like Option A would be less restrictive. This changes a lot if you are using fittings. Here is the site that I used. Pages 6 & 12 seem to have the info you seek. I am not an engineer so grain of salt needed but don't think my analysis is too far off. Maybe the experts can set us both straight. http://www.toolbase.org/PDF/DesignGuides/PEX_Installation_Handbook_2006.pdf
You are not authorized to post a reply.
Green Building Forums
--General Forum - Residential
--General Forum - Commercial
--Green/Energy-Efficient Design and Planning
--Green/Energy-Efficient Building and Construction
Green Building Technologies
--Insulating Concrete Forms (ICFs)
--Structural Insulated Panels (SIPs)
--Radiant Heating
--Geothermal Heat Pumps
--Solar and Wind Power
--Windows/Doors and Interior/Exterior Finish
--Appliances, Lighting and Kitchen/Bath Fixtures
Feedback/Support
--Rules, Instructions and Announcements
--Suggestions/Feedback
--Testing Area
Forums
>
Green Building Technologies
>
Radiant Heating
Active Forums 4.1
Membership:
Latest:
croccohvacusa
New Today:
0
New Yesterday:
0
Overall:
35027
People Online:
Visitors:
223
Members:
0
Total:
223