As far as I know, Logix is the only ICF system for which the manufacturer recommends the use of a welded wire reinforcement product ("Formloc" looks a whole lot like the Dur-O-Wall used in CMU block walls.
They call for a run of it in the second course, and subsequent runs every 4 or 5 courses thereafter.
Is this necessary? Is something like this used in other systems?
What does it do for us? |