Posted By Farmboy on 04/27/2008 2:09 AM
Dmaceld Say how is your house coming along? Dave
Slow but steady. The work crew consists primarily of me and one very capable helper. Concrete and excavation were contracted out.
We just completed laying the subfloor and will start stacking wall block tomorrow. So far we have excavation, footing, dimple membrane on the below ground portion, french drain outside, french drain for drain and vent on the inside of the footing, footing insulated, 3/4" foam over the entire crawl space with 2" concrete slab on top of it, sheetrock on the crawl space walls, pony walls, joists, subfloor, garage slab placed, concrete thresholds in all the doorways, good bit of drain plumbing installed in the crawl space, city sewer connection in, water supply connected, and majority of back fill in.
Whew, there's a lot of work from first shovel of dirt to the floor getting in place! Been working my butt off for 2 months now. Haven't done much anything else except eat and sleep! Have lot's of pics but am still working on finding time to get some posted at ownerbuilderbook.com.
Thanks for asking.
Mac