I'm doing my first job using Logix block ,any hints or tips using this block.Can I pour 9 feet in two liftswithout any problems? Thanks for any info.
FarmboyUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:356

--
05 Nov 2010 12:08 AM
Remember Logix block is not flippable and there are left- and right-hand corners. Look at the videos at their website www.logixicf.com for a decent overview.

9' pour in two lifts? Look at the Logix Product Manual , the section on Concrete Placement and you'll find a table that shows Lift Heights (6" slump) for temperature from 40 to 90 degrees F. The lower the temperature the shorter the lift height.

@ 40 degrees F,   lift height is 2' - 2.5"
@ 80 degrees F,   lift height is 4'-4.75"

Of course, bracing, additional form support and experience come into play as well. Good luck, Dave
renangleUser is Offline
Basic Member
Basic Member
Send Private Message
Posts:304

--
05 Nov 2010 08:28 AM
roch,

If stacked and braced properly two lifts shouldn't be a problem, though if you have never poured an ICF wall before, I would suggest three lifts. Normally you have the pump truck there for a minimum period of time, so cost shouldn't be an issue. Like farmboy said, be sure its a 6" slump or close to it, also use small stone and you should be fine. If the slump is significantly higher or lower than the 6" you are more likly to incur a problem.
You are not authorized to post a reply.

Active Forums 4.1
Membership Membership: Latest New User Latest: croccohvacusa New Today New Today: 0 New Yesterday New Yesterday: 0 User Count Overall: 35027
People Online People Online: Visitors Visitors: 210 Members Members: 0 Total Total: 210
Copyright 2011 by BuildCentral, Inc.   Terms Of Use  Privacy Statement