Good Afternoon,
We purchased an existing home built with Arxx ICF. The owners left two rooms unfinished. The first is approximately 4'x20'. The smell of unfinished moldy basement is prevalent. The room is used for the water softener, and to store paint.
1. Can we cover the walls with plastic to seal out some of the moisture? We are going to also paint the floors with concrete sealer.
2. If this permissable with ICF, can I use screws to attach it into the foam, or do I have to use adhesive caulk / glue?
Thanks,
Karen |