Lately I have seen them just stopping the wall, installing the coreslab and starting again...leaving a huge thermal break to the outside. But anytime we have done it, after you install the slabs you grout, order a load of regular mix concrete and pour about 3/4 (in your case 7-8") between the coreslab and the outside foam. Less pressure and less chance of the coreslab bulge |