Thanks for the thoughts...
Poured the slab on Monday. Weather was very wet so 1300sqft took about 20 hours before it was done. Then sealed it the next day. I attached the tubing(1100' in 5 loops) to wire mesh with about 1000 zip ties. Had a few extra pieces of mesh so layed them on top of the tubing in the middle of each potential room.
As far as I could tell, during the pour, nothing moved at all. At the most a few areas may have been lifted by 1/2' or so, but nothing significant. It all went very well. We now have a nice smooth floor with five useable heating zones. Next step is the manifolds and pump. I need to wait for the Geothermal equipment to be installed though.
Thanks again for the help. |