Forums
Register
Login
Unanswered
Active Topics
Forums
Search
Members
Forums
>
Green Building Forums
>
General Forum - Commercial
New Tribes Mission Church- SIPs construction
Last Post 28 Oct 2014 09:59 PM by
cmkavala
. 42 Replies.
Sort:
Oldest First
Most Recent First
Prev
Next
You are not authorized to post a reply.
Page 3 of 3
<<
<
1
2
3
Author
Messages
cmkavala
Veteran Member
Posts:4324
27 Oct 2014 06:38 PM
Panel installed over ridge and hip ..............
Chris Kavala<br>
[email protected]
<br>1-877-321-SIPS<br />
Jelly
Veteran Member
Posts:1017
28 Oct 2014 08:55 AM
Posted By cmkavala on 27 Oct 2014 03:59 AM
Hip with out top plate
So is that assembly composed of two C-joists screwed to a brake metal angle? Why are the legs of the brake metal so deep?
cmkavala
Veteran Member
Posts:4324
28 Oct 2014 09:59 PM
Jelly, They are used like a reciever channel
Chris Kavala<br>
[email protected]
<br>1-877-321-SIPS<br />
You are not authorized to post a reply.
Page 3 of 3
<<
<
1
2
3
Green Building Forums
--General Forum - Residential
--General Forum - Commercial
--Green/Energy-Efficient Design and Planning
--Green/Energy-Efficient Building and Construction
Green Building Technologies
--Insulating Concrete Forms (ICFs)
--Structural Insulated Panels (SIPs)
--Radiant Heating
--Geothermal Heat Pumps
--Solar and Wind Power
--Windows/Doors and Interior/Exterior Finish
--Appliances, Lighting and Kitchen/Bath Fixtures
Feedback/Support
--Rules, Instructions and Announcements
--Suggestions/Feedback
--Testing Area
Forums
>
Green Building Forums
>
General Forum - Commercial
Active Forums 4.1
Membership:
Latest:
janvin
New Today:
0
New Yesterday:
0
Overall:
34705
People Online:
Visitors:
78
Members:
1
Total:
79