New member here. Moved into home with 5 vertical wells in a glycol system. I am considering a patio (of some type) that would cover three of the five verticals and a section of lateral run headed to the house.
Installer is out of business, hvac contractor is available still.
I have a sketch with minimal dimensional detail of well placement.
Hvac contractor says all lines and wellheads are 5-6 feet below grade.
Issues I am attempting to find answers to are:
1) operating a track mounted skid steer over the installation.
2) removing a foot of earth safely, installing rock fill and compacting, them 4 inch of concrete.
3) do outside connections or well issues happen that will require tearing the patio out to make repairs?
It is a really small yard!!!
I know I probably should avoid all of this, yet doing my do diligence to confirm a potentially bad idea, and then figuring out other patio alternatives.
Thanks. |