We used 2' wide hollowcore precast 12" thick. They used silicone strips 2"x20"+ that were laid atop the 8" ICF core on the inside half. The precast overlapped about 4". They used 2 heavy duty cables with eyes at each end that hooked onto boom cable. They set about 1-2" apart and after unhooking cables they used a pry bar that did not chip the concrete and they slid together rather easily, thans to the silicone strips. They then drilled pilot holes through the hollow portion of the plank and into the ICF concrete, tapped in 14"-16" rebar dowels, and finally grouted the seams and around rebar holes. You can contact me, Dave, at
[email protected]. I hope this was not too simplified and was of help. Molin Concrete installed the precast.